Narrative:

Generator on a line aircraft was written up as inoperative. The generator was then 'maintenance deferred' and put on a category 'C' deferral -- meaning 10 days until repair required, in error. Proper category was 'B' for only 3 days until repair. Dmi was improperly done. Aircraft was subsequently flown beyond the legal time to fix of 3 days.

Google
 

Original NASA ASRS Text

Title: MDT OPERATED OVER THE LEGAL TIME FOR A DEFERRED ENG GENERATOR.

Narrative: GENERATOR ON A LINE ACFT WAS WRITTEN UP AS INOP. THE GENERATOR WAS THEN 'MAINT DEFERRED' AND PUT ON A CATEGORY 'C' DEFERRAL -- MEANING 10 DAYS UNTIL REPAIR REQUIRED, IN ERROR. PROPER CATEGORY WAS 'B' FOR ONLY 3 DAYS UNTIL REPAIR. DMI WAS IMPROPERLY DONE. ACFT WAS SUBSEQUENTLY FLOWN BEYOND THE LEGAL TIME TO FIX OF 3 DAYS.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.