Narrative:

1) #1 engine nose cowling installed on #2 engine, 2) wrong nose cowling brought to engine in shop, 3) mechanic installed cowling, 4) inspector checked installation and paperwork for inspection completed only, 5) records department checked paperwork part numbers, aug/wed/95, 6) changed cowling aug/thu/95. Engine installed on aircraft jun/wed/95 approximately at clt.

Google
 

Original NASA ASRS Text

Title: A MAINT INSPECTOR FOUND THAT THE WRONG NOSE COWLING WAS INSTALLED IN THE ENG BUILDUP SHOP.

Narrative: 1) #1 ENG NOSE COWLING INSTALLED ON #2 ENG, 2) WRONG NOSE COWLING BROUGHT TO ENG IN SHOP, 3) MECH INSTALLED COWLING, 4) INSPECTOR CHKED INSTALLATION AND PAPERWORK FOR INSPECTION COMPLETED ONLY, 5) RECORDS DEPT CHKED PAPERWORK PART NUMBERS, AUG/WED/95, 6) CHANGED COWLING AUG/THU/95. ENG INSTALLED ON ACFT JUN/WED/95 APPROX AT CLT.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.