Narrative:

Crew assigned 6000 ft. We were in the process of negotiating a change in runway and altitude and became distraction resulting in a loss in altitude of 500 ft. Factor: PF had 6 hours sleep previous night and was fatigued (also operated aircraft manually instead of autoplt).

Google
 

Original NASA ASRS Text

Title: DC9-10 MAINTAINING 6000 FT ON VECTOR TO RWY 18. REQUEST A CHANGE IN RWY TO RWY 32L OR RWY 36. CTLR VECTOR CHANGE AND CAPT THOUGHT CLRED TO DSND. GOT TO 5500 FT MANUALLY FLYING THE ACFT AND CAPT VERY TIRED FROM LACK OF SLEEP.

Narrative: CREW ASSIGNED 6000 FT. WE WERE IN THE PROCESS OF NEGOTIATING A CHANGE IN RWY AND ALT AND BECAME DISTR RESULTING IN A LOSS IN ALT OF 500 FT. FACTOR: PF HAD 6 HRS SLEEP PREVIOUS NIGHT AND WAS FATIGUED (ALSO OPERATED ACFT MANUALLY INSTEAD OF AUTOPLT).

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.