Narrative:

On mar/xa/98 at XA55 local, on vector heading of 120 degrees, I was instructed by dfw departure to climb from 3000 ft MSL to 4000 ft MSL and instructed to not exceed 180 KTS in climb. I leveled at 4000 ft MSL and accelerated to 210 KTS and then was questioned why I was doing 210 KTS. I said shg instructed me to not exceed 180 KTS in climb. She said she did not. Then I was instructed to climb and maintain 8000 ft and maintain 180 KTS. I did as instructed. She was angry when I was at 210 KTS at 4000 ft, but I was instructed not to exceed 180 KTS in climb, which when level will void the 180 KTS. Requested pull tape.

Google
 

Original NASA ASRS Text

Title: SMT ACR PIC DISPUTES INTENT OF ATC CLRNC AS STATED BY TRACON DEVELOPMENTAL CTLR ON DEP CLBOUT. PIC INCREASES SPD FROM ASSIGNED 180 KTS ON CLB TO 210 KTS WHEN LEVEL AT 4000 FT.

Narrative: ON MAR/XA/98 AT XA55 LCL, ON VECTOR HDG OF 120 DEGS, I WAS INSTRUCTED BY DFW DEP TO CLB FROM 3000 FT MSL TO 4000 FT MSL AND INSTRUCTED TO NOT EXCEED 180 KTS IN CLB. I LEVELED AT 4000 FT MSL AND ACCELERATED TO 210 KTS AND THEN WAS QUESTIONED WHY I WAS DOING 210 KTS. I SAID SHG INSTRUCTED ME TO NOT EXCEED 180 KTS IN CLB. SHE SAID SHE DID NOT. THEN I WAS INSTRUCTED TO CLB AND MAINTAIN 8000 FT AND MAINTAIN 180 KTS. I DID AS INSTRUCTED. SHE WAS ANGRY WHEN I WAS AT 210 KTS AT 4000 FT, BUT I WAS INSTRUCTED NOT TO EXCEED 180 KTS IN CLB, WHICH WHEN LEVEL WILL VOID THE 180 KTS. REQUESTED PULL TAPE.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.