Narrative:

Landing gear handle frozen in up position. DC9 abnormal for emergency landing gear extension accomplished and landing gear verified down and locked. Landing uneventful. Maintenance verified cause as excessive water draining from main deck melted snow froze landing gear control cables. Maintenance performed required procedures and returned aircraft to service.

Google
 

Original NASA ASRS Text

Title: FLC OF DC9 PERFORMED EMER GEAR EXTENSION PRIOR TO ARR AT BIL.

Narrative: LNDG GEAR HANDLE FROZEN IN UP POS. DC9 ABNORMAL FOR EMER LNDG GEAR EXTENSION ACCOMPLISHED AND LNDG GEAR VERIFIED DOWN AND LOCKED. LNDG UNEVENTFUL. MAINT VERIFIED CAUSE AS EXCESSIVE WATER DRAINING FROM MAIN DECK MELTED SNOW FROZE LNDG GEAR CTL CABLES. MAINT PERFORMED REQUIRED PROCS AND RETURNED ACFT TO SVC.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.