Narrative:

On aug/xa/99, I took a work turnover from swing shift on the installation of pneumatic drive motor and overpressure valve and associated ducting for the #1 reverser system. I completed the installation of the components and performed a leak check on the components I installed -- no air leaks were noted at that time. On the outbound flight, an air duct in the area where both shifts were working, came loose causing an in-flight shutdown and return to field. The problem was corrected at the gate and the flight was sent back out. At this time there is conflicting information on what clamp actually came loose.

Google
 

Original NASA ASRS Text

Title: A DC10-30 IMMEDIATELY AFTER TKOF DECLARED AN EMER AND DIVERTED DUE TO A FIRE OVERHEAT WARNING ON #1 ENG CAUSED BY A LOOSE PNEUMATIC DUCT CLAMP.

Narrative: ON AUG/XA/99, I TOOK A WORK TURNOVER FROM SWING SHIFT ON THE INSTALLATION OF PNEUMATIC DRIVE MOTOR AND OVERPRESSURE VALVE AND ASSOCIATED DUCTING FOR THE #1 REVERSER SYS. I COMPLETED THE INSTALLATION OF THE COMPONENTS AND PERFORMED A LEAK CHK ON THE COMPONENTS I INSTALLED -- NO AIR LEAKS WERE NOTED AT THAT TIME. ON THE OUTBOUND FLT, AN AIR DUCT IN THE AREA WHERE BOTH SHIFTS WERE WORKING, CAME LOOSE CAUSING AN INFLT SHUTDOWN AND RETURN TO FIELD. THE PROB WAS CORRECTED AT THE GATE AND THE FLT WAS SENT BACK OUT. AT THIS TIME THERE IS CONFLICTING INFO ON WHAT CLAMP ACTUALLY CAME LOOSE.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.