Narrative:

This flight was a 2 engine ferry with the #2 engine inoperative due to maintenance. This was my first 2 engine ferry in type and was busy during preflight, ensuring all paperwork and maintenance logs were complete. We had more fuel on board than the initial flight plan reflected, and I wanted an accurate fuel burn for the flight as well as the excess amount was above the limit for extra gas without an amended release. I had intended to have the first officer inform clearance delivery that we would not be able to make the 10 DME crossing restr at 5000 ft due to our situation. Even though it was filed in remarks (2 engine ferry) on the flight, I assumed that we would still be required to make the SID unless otherwise notified. When we finally received our new flight plan and got our clearance, I inadvertently failed to inform ATC that we were unable to comply with the SID. We completed our checklists and departed and about the time I realized my mistake, ATC assigned us 4000 ft. These ferries are so rare, I'm not sure I can think of a solution other than adding an item in the 2 engine checklist that reflects consideration of SID crossing restrs.

Google
 

Original NASA ASRS Text

Title: A NEAR FLC DEV WHEN A 2 ENG FERRY FLT OF AN L1011 WAS NOT GOING TO MAKE AN ALT XING RESTR ON DEP PROC OUT OF DTW, MI.

Narrative: THIS FLT WAS A 2 ENG FERRY WITH THE #2 ENG INOP DUE TO MAINT. THIS WAS MY FIRST 2 ENG FERRY IN TYPE AND WAS BUSY DURING PREFLT, ENSURING ALL PAPERWORK AND MAINT LOGS WERE COMPLETE. WE HAD MORE FUEL ON BOARD THAN THE INITIAL FLT PLAN REFLECTED, AND I WANTED AN ACCURATE FUEL BURN FOR THE FLT AS WELL AS THE EXCESS AMOUNT WAS ABOVE THE LIMIT FOR EXTRA GAS WITHOUT AN AMENDED RELEASE. I HAD INTENDED TO HAVE THE FO INFORM CLRNC DELIVERY THAT WE WOULD NOT BE ABLE TO MAKE THE 10 DME XING RESTR AT 5000 FT DUE TO OUR SIT. EVEN THOUGH IT WAS FILED IN REMARKS (2 ENG FERRY) ON THE FLT, I ASSUMED THAT WE WOULD STILL BE REQUIRED TO MAKE THE SID UNLESS OTHERWISE NOTIFIED. WHEN WE FINALLY RECEIVED OUR NEW FLT PLAN AND GOT OUR CLRNC, I INADVERTENTLY FAILED TO INFORM ATC THAT WE WERE UNABLE TO COMPLY WITH THE SID. WE COMPLETED OUR CHKLISTS AND DEPARTED AND ABOUT THE TIME I REALIZED MY MISTAKE, ATC ASSIGNED US 4000 FT. THESE FERRIES ARE SO RARE, I'M NOT SURE I CAN THINK OF A SOLUTION OTHER THAN ADDING AN ITEM IN THE 2 ENG CHKLIST THAT REFLECTS CONSIDERATION OF SID XING RESTRS.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.