Narrative:

I replaced #1 and #2 cabin pressurization controllers. I accomplished the bite checks for both controllers but I forgot that I had to accomplish a static leak check. I notified abc wzxx gf ZZZ aft line at XD45 so he could notify maintenance technician to schedule a static check. This event occurred shortly after aircraft departed ZZZ.

Google
 

Original NASA ASRS Text

Title: AN MD SUPER 80 WAS DISPATCHED AND OPERATED IN NON COMPLIANCE WITH #1 AND #2 PRESSURE CONTROLLERS REPLACED AND REQUIRED PITOT STATIC NOT ACCOMPLISHED.

Narrative: I REPLACED #1 AND #2 CABIN PRESSURIZATION CONTROLLERS. I ACCOMPLISHED THE BITE CHKS FOR BOTH CONTROLLERS BUT I FORGOT THAT I HAD TO ACCOMPLISH A STATIC LEAK CHK. I NOTIFIED ABC WZXX GF ZZZ AFT LINE AT XD45 SO HE COULD NOTIFY MAINT TECHNICIAN TO SCHEDULE A STATIC CHK. THIS EVENT OCCURRED SHORTLY AFTER ACFT DEPARTED ZZZ.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.