37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 496808 |
Time | |
Date | 200012 |
Day | Fri |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | DC-10 40 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : parked ground : maintenance |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Qualification | technician : airframe technician : powerplant |
Experience | maintenance technician : 4 |
ASRS Report | 496808 |
Person 2 | |
Affiliation | company : air carrier |
Function | other personnel other |
Qualification | other other : + |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper documentation non adherence : far non adherence : published procedure |
Independent Detector | other other : 1 |
Resolutory Action | none taken : detected after the fact |
Consequence | other other |
Factors | |
Maintenance | contributing factor : work cards contributing factor : manuals contributing factor : engineering procedure performance deficiency : training |
Supplementary | |
Problem Areas | Chart Or Publication Aircraft Maintenance Human Performance |
Primary Problem | Chart Or Publication |
Narrative:
Removed control cables to facilitate drill guide. Engineering order did not cover removing cable, but removal was necessary to accomplish engineering order. Engineering order should have had steps to cover cable removal and installation.
Original NASA ASRS Text
Title: DURING ACCOMPLISHMENT OF AN ENGINEERING ORDER, FOR A DC-10-40, IT WAS FOUND NECESSARY TO REMOVE AND DISCONNECT FLT CONTROL CABLES NOT NOTED ON THE ENGINEERING ORDER JOB CARD.
Narrative: REMOVED CONTROL CABLES TO FACILITATE DRILL GUIDE. ENGINEERING ORDER DID NOT COVER REMOVING CABLE, BUT REMOVAL WAS NECESSARY TO ACCOMPLISH ENGINEERING ORDER. ENGINEERING ORDER SHOULD HAVE HAD STEPS TO COVER CABLE REMOVAL AND INSTALLATION.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.