37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 513398 |
Time | |
Date | 200106 |
Day | Sun |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : mia.airport |
State Reference | FL |
Altitude | msl single value : 1500 |
Environment | |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tracon : mia.tracon tower : zzz.tower |
Operator | common carrier : air carrier |
Make Model Name | B757 Undifferentiated or Other Model |
Operating Under FAR Part | Part 121 |
Navigation In Use | ils localizer & glide slope : 30 |
Flight Phase | descent : approach |
Route In Use | approach : instrument precision |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
ASRS Report | 513398 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : commercial pilot : instrument pilot : multi engine |
ASRS Report | 513394 |
Events | |
Anomaly | non adherence : clearance other anomaly |
Independent Detector | atc equipment other atc equipment : radar other controllera |
Resolutory Action | controller : issued advisory |
Consequence | faa : reviewed incident with flight crew other |
Supplementary | |
Problem Areas | ATC Human Performance Flight Crew Human Performance |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | Pilot Deviation |
Narrative:
Controller restr us to 180 KTS to 5 NM final. This puts the aircraft 50 KTS above approach speed just before starting down at birdd on a steeper than normal glide path. We started slowing early in order to achieve approach speed before descent on final. Controller asked us about our speed vice the clearance. We should have informed him earlier about our slowdown. However, believe the clearance was not in the best interest of a safe approach in accordance with company guidelines.
Original NASA ASRS Text
Title: B757 FLC REDUCE SPD PRIOR TO 5 MI FINAL TO STABILIZE APCH FOR LNDG WITHOUT ADVISING MIA.
Narrative: CTLR RESTR US TO 180 KTS TO 5 NM FINAL. THIS PUTS THE ACFT 50 KTS ABOVE APCH SPD JUST BEFORE STARTING DOWN AT BIRDD ON A STEEPER THAN NORMAL GLIDE PATH. WE STARTED SLOWING EARLY IN ORDER TO ACHIEVE APCH SPD BEFORE DSCNT ON FINAL. CTLR ASKED US ABOUT OUR SPD VICE THE CLRNC. WE SHOULD HAVE INFORMED HIM EARLIER ABOUT OUR SLOWDOWN. HOWEVER, BELIEVE THE CLRNC WAS NOT IN THE BEST INTEREST OF A SAFE APCH IN ACCORDANCE WITH COMPANY GUIDELINES.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.