Air carrier X, a scheduled departure out of ZZZ, requested a push clearance off gate. The equipment in the ramp tower, showed the aircraft to be at gate xo. The aircraft was issued a push clearance and backed off X2. At the time, the ramp controller had another aircraft to pass directly behind X2 wbound, but saw that air carrier X was coming off gate X2 and caught the error. Traffic was light with only a few movements on the ramp. During a busy arrival/departure bank however, we could have had a problem.

Google
 

Original NASA ASRS Text

Title: ZZZ RAMP CTLR OBSERVES NEW GUIDANCE SYS ERROR WHEN ACR AUTH PUSHBACK IS INITIATED AT A DIFFERENT GATE THAN INDICATED AND INTERVENES TO STOP A RAMP CONFLICT WITH AN INBOUND ACR INTO THE RAMP CTL AREA.

Narrative: ACR X, A SCHEDULED DEP OUT OF ZZZ, REQUESTED A PUSH CLRNC OFF GATE. THE EQUIP IN THE RAMP TWR, SHOWED THE ACFT TO BE AT GATE XO. THE ACFT WAS ISSUED A PUSH CLRNC AND BACKED OFF X2. AT THE TIME, THE RAMP CTLR HAD ANOTHER ACFT TO PASS DIRECTLY BEHIND X2 WBOUND, BUT SAW THAT ACR X WAS COMING OFF GATE X2 AND CAUGHT THE ERROR. TFC WAS LIGHT WITH ONLY A FEW MOVEMENTS ON THE RAMP. DURING A BUSY ARR/DEP BANK HOWEVER, WE COULD HAVE HAD A PROB.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.