Narrative:

Due to a possible error in hardware stocking, there may exist a condition in which incorrect bolts, supplied with the mount installation kit, were installed on any number of engines. Callback conversation with reporter revealed the following information: the reporter stated the bolts were exactly the same as the normal bolts in length, size and grip and only 1 number off. Engineering alerted rolls royce and an engineering variance authority/authorized was issued by rolls royce to continue in service and replace the bolts at next engine shop visit.

Google
 

Original NASA ASRS Text

Title: DUE TO A STOCKING ERROR (RB211-535E4) ENG FORWARD MOUNT BOLTS WERE INSTALLED WITH THE INCORRECT BOLTS.

Narrative: DUE TO A POSSIBLE ERROR IN HARDWARE STOCKING, THERE MAY EXIST A CONDITION IN WHICH INCORRECT BOLTS, SUPPLIED WITH THE MOUNT INSTALLATION KIT, WERE INSTALLED ON ANY NUMBER OF ENGS. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: THE RPTR STATED THE BOLTS WERE EXACTLY THE SAME AS THE NORMAL BOLTS IN LENGTH, SIZE AND GRIP AND ONLY 1 NUMBER OFF. ENGINEERING ALERTED ROLLS ROYCE AND AN ENGINEERING VARIANCE AUTH WAS ISSUED BY ROLLS ROYCE TO CONTINUE IN SVC AND REPLACE THE BOLTS AT NEXT ENG SHOP VISIT.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.