Narrative:

Had the computer system combined my flight time (block) as a line check airman, I may have realized how close I was to exceeding 100 hours in 30 days. As I reported to the ramp for my flight to tokyo's narita airport (nrt), seeing that the flight time was 30 mins more because of headwinds, I would have known that this block time would put me over 100 hours. Since air carrier X divides the block time between captain and first officer, I didn't realize how close I was or I would have notified them that the block time for that day would put me over. As a result, I had exceeded the 100 hours when I landed in narita. I will be sure to track this with my personal logbook in the future. Thank you for your assistance and help.

Google
 

Original NASA ASRS Text

Title: AN ACR PLT AND HIS CREW TRACKING DEPT DID NOT CATCH THE FACT THAT THE PLANNED FLT TIME FOR AN INTL FLT WOULD PUT THE PLT BEYOND THE ALLOWED 100 HRS IN 30 DAYS SO HE OPERATED THE FLT IN NON COMPLIANCE WITH THE FAR.

Narrative: HAD THE COMPUTER SYS COMBINED MY FLT TIME (BLOCK) AS A LINE CHK AIRMAN, I MAY HAVE REALIZED HOW CLOSE I WAS TO EXCEEDING 100 HRS IN 30 DAYS. AS I RPTED TO THE RAMP FOR MY FLT TO TOKYO'S NARITA ARPT (NRT), SEEING THAT THE FLT TIME WAS 30 MINS MORE BECAUSE OF HEADWINDS, I WOULD HAVE KNOWN THAT THIS BLOCK TIME WOULD PUT ME OVER 100 HRS. SINCE ACR X DIVIDES THE BLOCK TIME BTWN CAPT AND FO, I DIDN'T REALIZE HOW CLOSE I WAS OR I WOULD HAVE NOTIFIED THEM THAT THE BLOCK TIME FOR THAT DAY WOULD PUT ME OVER. AS A RESULT, I HAD EXCEEDED THE 100 HRS WHEN I LANDED IN NARITA. I WILL BE SURE TO TRACK THIS WITH MY PERSONAL LOGBOOK IN THE FUTURE. THANK YOU FOR YOUR ASSISTANCE AND HELP.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.