37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 537827 |
Time | |
Date | 200202 |
Day | Fri |
Local Time Of Day | 1801 To 2400 |
Place | |
Locale Reference | atc facility : zoa.artcc |
State Reference | CA |
Altitude | msl single value : 29000 |
Environment | |
Flight Conditions | VMC |
Aircraft 1 | |
Controlling Facilities | artcc : zoa.artcc |
Operator | common carrier : air carrier |
Make Model Name | A320 |
Operating Under FAR Part | Part 121 |
Navigation In Use | other |
Flight Phase | cruise : level |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
ASRS Report | 537827 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Events | |
Anomaly | non adherence : far non adherence : company policies non adherence : published procedure other anomaly other other spatial deviation |
Independent Detector | atc equipment other atc equipment : radar other controllera other flight crewa other flight crewb |
Resolutory Action | controller : issued alert flight crew : returned to intended or assigned course none taken : detected after the fact |
Consequence | other |
Supplementary | |
Problem Areas | Company Flight Crew Human Performance |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | Pilot Deviation |
Narrative:
First officer loaded the flight plan into the FMS. After he finished, we received the pre departure clearance. There was a change in routing which I revised in the FMC. The first officer looked at the pre departure clearance and changed the route again. He misunderstood the revised segment on the pre departure clearance. Original route: oak.OAK5.oak..lin.J84.MVA.J198.ilc.J58 mlf hbu POWDR4 den. Pre departure clearance route: oak OAK5 oak lin J84 dta jnc POWDR4 den. Revised segment: OAK5 oak lin J84 MVA. Final route in FMC: OAK5 lin J84MVA jnc POWDR4 den.
Original NASA ASRS Text
Title: A320 CREW HAD TRACK DEV IN ZOA CLASS A AIRSPACE AFTER A PREFLT CLRNC ROUTING CHANGE WAS ISSUED.
Narrative: FO LOADED THE FLT PLAN INTO THE FMS. AFTER HE FINISHED, WE RECEIVED THE PDC. THERE WAS A CHANGE IN ROUTING WHICH I REVISED IN THE FMC. THE FO LOOKED AT THE PDC AND CHANGED THE RTE AGAIN. HE MISUNDERSTOOD THE REVISED SEGMENT ON THE PDC. ORIGINAL RTE: OAK.OAK5.OAK..LIN.J84.MVA.J198.ILC.J58 MLF HBU POWDR4 DEN. PDC RTE: OAK OAK5 OAK LIN J84 DTA JNC POWDR4 DEN. REVISED SEGMENT: OAK5 OAK LIN J84 MVA. FINAL RTE IN FMC: OAK5 LIN J84MVA JNC POWDR4 DEN.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.