37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 559783 |
Time | |
Date | 200208 |
Day | Fri |
Place | |
Locale Reference | airport : tist.airport |
State Reference | FO |
Altitude | agl single value : 0 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B757 Undifferentiated or Other Model |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : taxi |
Flight Plan | IFR |
Aircraft 2 | |
Controlling Facilities | tower : tist.tower |
Operator | common carrier : air carrier |
Make Model Name | A319 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : taxi |
Flight Plan | IFR |
Person 1 | |
Affiliation | government : faa |
Function | controller : local controller : ground |
Qualification | controller : radar |
Experience | controller limited radar : 1 controller military : 4 controller non radar : 6 controller radar : 13 controller supervisory : 8 controller time certified in position1 : 20 |
ASRS Report | 559783 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Events | |
Anomaly | incursion : runway non adherence : clearance |
Independent Detector | other controllera |
Resolutory Action | controller : separated traffic none taken : anomaly accepted |
Supplementary | |
Problem Areas | Flight Crew Human Performance Airport |
Primary Problem | Airport |
Air Traffic Incident | Pilot Deviation |
Situations | |
Airport | construction : tist.airport |
Narrative:
Both aircraft were told to taxi to runway 10 at intersection C. Parallel taxiway is closed, has been for 4 months. Both aircraft tried to back taxi on runway instead of holding short at intersection C. Construction delays on taxiway construction has gone on for 4 months. Due to dispute between a/P management and contractor, taxiway has been closed too long. Long delays and safety are increasing issues.
Original NASA ASRS Text
Title: CTLR AT TIST INSTRUCTED A B757 AND AN A319 TO TAXI TO RWY 10 INTXN C. BOTH ACFT ATTEMPTED TO USE RWY 10 TO BACK TAXI WITHOUT A CLRNC RESULTING IN RWY INCURSIONS.
Narrative: BOTH ACFT WERE TOLD TO TAXI TO RWY 10 AT INTXN C. PARALLEL TXWY IS CLOSED, HAS BEEN FOR 4 MONTHS. BOTH ACFT TRIED TO BACK TAXI ON RWY INSTEAD OF HOLDING SHORT AT INTXN C. CONSTRUCTION DELAYS ON TXWY CONSTRUCTION HAS GONE ON FOR 4 MONTHS. DUE TO DISPUTE BTWN A/P MGMNT AND CONTRACTOR, TXWY HAS BEEN CLOSED TOO LONG. LONG DELAYS AND SAFETY ARE INCREASING ISSUES.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.