Narrative:

Installed clip for structural rib xrs 442.5 with next size fastener without eso (engineering service order) and eco (engineering change order). Installed clip on same rib not per blueprint without eso or eso. Harassment from supervisor. Manager and supervisor harassed and used intimidation to get employees to do repairs not per repair document, maintenance manual or blueprint and wait on engineering disposition. Later 2 shifts working from 2 different print confign.

Google
 

Original NASA ASRS Text

Title: AN MD80 STRUCTURAL REPAIR WAS ACCOMPLISHED IN NON COMPLIANCE USING OVERSIZE FASTENERS NOT PER BLUEPRINT WITHOUT ENGINEERING APPROVAL.

Narrative: INSTALLED CLIP FOR STRUCTURAL RIB XRS 442.5 WITH NEXT SIZE FASTENER WITHOUT ESO (ENGINEERING SVC ORDER) AND ECO (ENGINEERING CHANGE ORDER). INSTALLED CLIP ON SAME RIB NOT PER BLUEPRINT WITHOUT ESO OR ESO. HARASSMENT FROM SUPVR. MGR AND SUPVR HARASSED AND USED INTIMIDATION TO GET EMPLOYEES TO DO REPAIRS NOT PER REPAIR DOCUMENT, MAINT MANUAL OR BLUEPRINT AND WAIT ON ENGINEERING DISPOSITION. LATER 2 SHIFTS WORKING FROM 2 DIFFERENT PRINT CONFIGN.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.