37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 609965 |
Time | |
Date | 200402 |
Day | Fri |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : slc.airport |
State Reference | UT |
Altitude | msl bound lower : 4227 msl bound upper : 20000 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tracon : s56.tracon |
Operator | common carrier : air carrier |
Make Model Name | B757 Undifferentiated or Other Model |
Operating Under FAR Part | Part 121 |
Navigation In Use | other |
Flight Phase | climbout : takeoff climbout : initial |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
Experience | flight time last 90 days : 180 flight time total : 15000 |
ASRS Report | 609965 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Events | |
Anomaly | aircraft equipment problem : critical |
Independent Detector | aircraft equipment other aircraft equipment : elevator operation ctl other flight crewa other flight crewb |
Resolutory Action | none taken : anomaly accepted |
Consequence | other |
Supplementary | |
Problem Areas | Aircraft |
Primary Problem | Aircraft |
Narrative:
During rotation on departure from slc to anc, there was a hesitation or a resistance in the elevator. The resistance was only momentary and the aircraft was hand flown to approximately FL200 with no further problems. During the hand flown portion of the approach and landing, additional roughness and resistance was present in the elevator. Maintenance was accomplished to correct. The problem was a binding or restr bearing in the elevator ctring assembly.
Original NASA ASRS Text
Title: A B757-200 ON ROTATION EXPERIENCED HESITATION OR RESISTANCE IN THE ELEVATOR. DURING HAND FLOWN APCH ADDITIONAL ROUGHNESS WAS PRESENT. CAUSED BY A RESTR BEARING IN THE ELEVATOR FEEL AND CTRING UNIT.
Narrative: DURING ROTATION ON DEP FROM SLC TO ANC, THERE WAS A HESITATION OR A RESISTANCE IN THE ELEVATOR. THE RESISTANCE WAS ONLY MOMENTARY AND THE ACFT WAS HAND FLOWN TO APPROX FL200 WITH NO FURTHER PROBS. DURING THE HAND FLOWN PORTION OF THE APCH AND LNDG, ADDITIONAL ROUGHNESS AND RESISTANCE WAS PRESENT IN THE ELEVATOR. MAINT WAS ACCOMPLISHED TO CORRECT. THE PROB WAS A BINDING OR RESTR BEARING IN THE ELEVATOR CTRING ASSEMBLY.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.