Narrative:

On dec/wed/04 at approximately XA00, the sheet metal crew was tasked to repair an aft pit sidewall liner on aircraft X. The sheet metal crew accessed an aircraft specific engineering authority/authorized which was written for aircraft Y, and used this for the repair. I signed the engineering authority/authorized in the supervisor verification area and did not notice the tail number for which aircraft it was for.

Google
 

Original NASA ASRS Text

Title: A B737-900 AFT CARGO COMPARTMENT SIDEWALL LINER WAS REPAIRED USING AN ACFT SPECIFIC ENGINEERING AUTH WRITTEN FOR ANOTHER ACFT.

Narrative: ON DEC/WED/04 AT APPROX XA00, THE SHEET METAL CREW WAS TASKED TO REPAIR AN AFT PIT SIDEWALL LINER ON ACFT X. THE SHEET METAL CREW ACCESSED AN ACFT SPECIFIC ENGINEERING AUTH WHICH WAS WRITTEN FOR ACFT Y, AND USED THIS FOR THE REPAIR. I SIGNED THE ENGINEERING AUTH IN THE SUPVR VERIFICATION AREA AND DID NOT NOTICE THE TAIL NUMBER FOR WHICH ACFT IT WAS FOR.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.