Narrative:

Controller stated that airplane climbed from 1500 ft to assigned altitude of 2000 ft before plane reached the teb 4.5 DME fix. Pilot feels he followed the SID and did not start climb from 1500 ft to 2000 ft until the 4 DME fix and controller was incorrect.

Google
 

Original NASA ASRS Text

Title: C525 PLT DISPUTES ATC CLAIM OF FAILURE TO MEET TEB 5 DEP CLB RESTRS.

Narrative: CTLR STATED THAT AIRPLANE CLBED FROM 1500 FT TO ASSIGNED ALT OF 2000 FT BEFORE PLANE REACHED THE TEB 4.5 DME FIX. PLT FEELS HE FOLLOWED THE SID AND DID NOT START CLB FROM 1500 FT TO 2000 FT UNTIL THE 4 DME FIX AND CTLR WAS INCORRECT.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.