37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 686664 |
Time | |
Date | 200602 |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tower : zzz.tower |
Operator | common carrier : air carrier |
Make Model Name | EMB ERJ 145 ER&LR |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : maintenance |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 686664 |
Person 2 | |
Affiliation | company : air carrier |
Function | other personnel other |
Events | |
Anomaly | aircraft equipment problem : less severe maintenance problem : improper documentation non adherence : far non adherence : published procedure |
Independent Detector | other other : 2 |
Resolutory Action | none taken : detected after the fact |
Consequence | other |
Factors | |
Maintenance | contributing factor : schedule pressure performance deficiency : installation performance deficiency : logbook entry performance deficiency : non compliance with legal requirements |
Supplementary | |
Problem Areas | Chart Or Publication Maintenance Human Performance Environmental Factor Aircraft |
Primary Problem | Maintenance Human Performance |
Narrative:
Under guidance from technical services issued time deferral maintenance item on aircraft per gpm 16-02. Should have requested engineering order to cover sealant and nycote. Mod noticed incorrect reference and instructed to correct reference and ground aircraft for issuance of engineering order or application of sealant and nycote. Applied sealant and nycote while engineering order was requested and cleared time deferral maintenance item. Suggestions: a general engineering order covering specific bonding straps deferral of sealant and/or nycote. Current engineering orders are aircraft specific only.
Original NASA ASRS Text
Title: AN EMB145 HAD BONDING STRAPS REPLACED OR REPAIRED BUT NOT SEALED. SEALANT WAS DEFERRED IMPROPERLY. ACFT GNDED FOR SEALANT INSTALLATION.
Narrative: UNDER GUIDANCE FROM TECHNICAL SVCS ISSUED TIME DEFERRAL MAINT ITEM ON ACFT PER GPM 16-02. SHOULD HAVE REQUESTED ENGINEERING ORDER TO COVER SEALANT AND NYCOTE. MOD NOTICED INCORRECT REFERENCE AND INSTRUCTED TO CORRECT REFERENCE AND GND ACFT FOR ISSUANCE OF ENGINEERING ORDER OR APPLICATION OF SEALANT AND NYCOTE. APPLIED SEALANT AND NYCOTE WHILE ENGINEERING ORDER WAS REQUESTED AND CLRED TIME DEFERRAL MAINT ITEM. SUGGESTIONS: A GENERAL ENGINEERING ORDER COVERING SPECIFIC BONDING STRAPS DEFERRAL OF SEALANT AND/OR NYCOTE. CURRENT ENGINEERING ORDERS ARE ACFT SPECIFIC ONLY.
Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.