37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 687293 |
Time | |
Date | 200601 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B777 Undifferentiated or Other Model |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : maintenance |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 687293 |
Person 2 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 687294 |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance non adherence : far non adherence : published procedure |
Independent Detector | other other : 3 |
Resolutory Action | none taken : detected after the fact |
Consequence | other other |
Factors | |
Maintenance | contributing factor : engineering procedure contributing factor : work cards performance deficiency : inspection performance deficiency : installation performance deficiency : scheduled maintenance performance deficiency : non compliance with legal requirements |
Supplementary | |
Problem Areas | Maintenance Human Performance Aircraft Chart Or Publication Environmental Factor |
Primary Problem | Maintenance Human Performance |
Narrative:
Was assigned replacement of oil pump drive gear breather rotor group in hangar on jan/sat/06. Me and 2 other mechanics. Replaced the group per engineering change order instructions and may have inadvertently not secured discrepant oil plug. We were not aware at the time of service bulletin X that changes that particular bolt to a 6 point head to alleviate this from happening again. Became aware of service bulletin X and reviewed it; so this type of event does not occur again.
Original NASA ASRS Text
Title: A B777 ENG GEAR BOX HAD AN ENGINEERING CHANGE ORDER ACCOMPLISHED AND MAY HAVE BEEN ACCOMPLISHED WITH AN UNSECURED OIL PLUG.
Narrative: WAS ASSIGNED REPLACEMENT OF OIL PUMP DRIVE GEAR BREATHER ROTOR GROUP IN HANGAR ON JAN/SAT/06. ME AND 2 OTHER MECHS. REPLACED THE GROUP PER ENGINEERING CHANGE ORDER INSTRUCTIONS AND MAY HAVE INADVERTENTLY NOT SECURED DISCREPANT OIL PLUG. WE WERE NOT AWARE AT THE TIME OF SVC BULLETIN X THAT CHANGES THAT PARTICULAR BOLT TO A 6 POINT HEAD TO ALLEVIATE THIS FROM HAPPENING AGAIN. BECAME AWARE OF SVC BULLETIN X AND REVIEWED IT; SO THIS TYPE OF EVENT DOES NOT OCCUR AGAIN.