37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 703770 |
Time | |
Date | 200607 |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | A319 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : preflight |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
Experience | flight time last 90 days : 250 flight time total : 26000 flight time type : 6000 |
ASRS Report | 703770 |
Events | |
Independent Detector | other flight crewa |
Resolutory Action | none taken : unable |
Supplementary | |
Problem Areas | Company |
Primary Problem | Company |
Narrative:
The company requires compliance with a checklist without furnishing pilots expanded procedures after start. Requires setting flaps without weight and balance numbers. Callback conversation with reporter revealed the following information: reporter stated that on the date of the checklist transition flight crews at his crew base had no expanded checklist procedures explaining how to accomplish the new checklist items. As a result the pilots operated under the old checklists and checklist procedures that they had worked the day before. His air carrier told those pilots to submit written reports.
Original NASA ASRS Text
Title: A PLT RPTS THAT HIS ACR INSTITUTED NEW CHKLIST PROCS WITHOUT ISSUING PLTS THE NECESSARY EXPANDED CHKLIST EXPLANATION MATERIAL.
Narrative: THE COMPANY REQUIRES COMPLIANCE WITH A CHKLIST WITHOUT FURNISHING PLTS EXPANDED PROCS AFTER START. REQUIRES SETTING FLAPS WITHOUT WT AND BAL NUMBERS. CALLBACK CONVERSATION WITH RPTR REVEALED THE FOLLOWING INFO: RPTR STATED THAT ON THE DATE OF THE CHKLIST TRANSITION FLT CREWS AT HIS CREW BASE HAD NO EXPANDED CHKLIST PROCS EXPLAINING HOW TO ACCOMPLISH THE NEW CHKLIST ITEMS. AS A RESULT THE PLTS OPERATED UNDER THE OLD CHKLISTS AND CHKLIST PROCS THAT THEY HAD WORKED THE DAY BEFORE. HIS ACR TOLD THOSE PLTS TO SUBMIT WRITTEN RPTS.
Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.