Narrative:

Overflt of a scheduled replacement for the radome -- was supposed to be replaced at 50 cycles; and we flew it at approximately 59 cycles.

Google
 

Original NASA ASRS Text

Title: AN EMB145 WITH A CYCLE LIMITED DEFERRED ITEM FOR THE RADOME REPLACEMENT DUE TO LIGHTNING STRIKE DAMAGE WAS OVERFLOWN BY 9 CYCLES.

Narrative: OVERFLT OF A SCHEDULED REPLACEMENT FOR THE RADOME -- WAS SUPPOSED TO BE REPLACED AT 50 CYCLES; AND WE FLEW IT AT APPROX 59 CYCLES.