Narrative:

Thunderstorms and rain in area. Worked final radar monitor for 1 hour 14 mins; as soon as I closed that position and was reassigned to the 'Q' radar position; that was combined with 2 other radar position with moderate to heavy traffic for 1 hour 12 mins for a total of 2 hours 29 mins due to lack of controllers. The last 10 mins that I worked was a struggle to stay focused due to fatigue. Working for 2 1/2 hours with 7-10 aircraft on the frequency at all times. With thunderstorms and 3 position combined is an unsafe operation due to lack of staffing.

Google
 

Original NASA ASRS Text

Title: APCH CTLR AT CLT RPTS UNDERSTAFFING RESULTING LONG WORK PERIODS WITH NO BREAKS.

Narrative: TSTMS AND RAIN IN AREA. WORKED FINAL RADAR MONITOR FOR 1 HR 14 MINS; AS SOON AS I CLOSED THAT POS AND WAS REASSIGNED TO THE 'Q' RADAR POS; THAT WAS COMBINED WITH 2 OTHER RADAR POS WITH MODERATE TO HVY TFC FOR 1 HR 12 MINS FOR A TOTAL OF 2 HRS 29 MINS DUE TO LACK OF CTLRS. THE LAST 10 MINS THAT I WORKED WAS A STRUGGLE TO STAY FOCUSED DUE TO FATIGUE. WORKING FOR 2 1/2 HRS WITH 7-10 ACFT ON THE FREQ AT ALL TIMES. WITH TSTMS AND 3 POS COMBINED IS AN UNSAFE OP DUE TO LACK OF STAFFING.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.