Narrative:

I was advised of a situation by my manager regarding some pylon screws on aircraft. I completed a maintenance service check on this aircraft on aug/xa/06. In thinking back to this night I recall performing a visual inspection of the #1 and #2 upper pylon panels. Visually there were no defects. As extra insurance I then applied my screw driver to the heads of the screws on the leading edge of the upper strut to wing fairing. On the #1 side I was able to get a 1/8-1/4 turn on 2 screws. On #2 side I was able to get a 1/8-1/4 turn on 3 screws. I then continued on to the rest of my task. The maintenance service check has instructions (engines -- step #1 item B) to generate a nrc (non routine card) to install or tighten fasteners. I did not believe at the time that I did either with this minimal movement. While the maintenance service check states that; the service check paperwork states (20; item B) to generate a nrc for loose; pulled or missing fasteners; the maintenance service check per mt 312-00-01 has you checking the same panels (11; item B) but does not have the requirement for the nrc. I find the requirement to do these tasks on separate checks with different paperwork requirements confusing.

Google
 

Original NASA ASRS Text

Title: A B737-300 TECHNICIAN RPTS CONFUSION ON OVERNIGHT SVC CHK JOB CARDS. NUMBERED CHKS DIFFER WITH REQUIREMENTS FOR NON ROUTINE CARD ENTRY CALLING FOR ADDITIONAL CHKS. (EXAMPLE) #2 CHK CALLS FOR PYLON PANEL SECURITY CHKS.

Narrative: I WAS ADVISED OF A SIT BY MY MGR REGARDING SOME PYLON SCREWS ON ACFT. I COMPLETED A MAINT SVC CHK ON THIS ACFT ON AUG/XA/06. IN THINKING BACK TO THIS NIGHT I RECALL PERFORMING A VISUAL INSPECTION OF THE #1 AND #2 UPPER PYLON PANELS. VISUALLY THERE WERE NO DEFECTS. AS EXTRA INSURANCE I THEN APPLIED MY SCREW DRIVER TO THE HEADS OF THE SCREWS ON THE LEADING EDGE OF THE UPPER STRUT TO WING FAIRING. ON THE #1 SIDE I WAS ABLE TO GET A 1/8-1/4 TURN ON 2 SCREWS. ON #2 SIDE I WAS ABLE TO GET A 1/8-1/4 TURN ON 3 SCREWS. I THEN CONTINUED ON TO THE REST OF MY TASK. THE MAINT SVC CHK HAS INSTRUCTIONS (ENGS -- STEP #1 ITEM B) TO GENERATE A NRC (NON ROUTINE CARD) TO INSTALL OR TIGHTEN FASTENERS. I DID NOT BELIEVE AT THE TIME THAT I DID EITHER WITH THIS MINIMAL MOVEMENT. WHILE THE MAINT SVC CHK STATES THAT; THE SVC CHK PAPERWORK STATES (20; ITEM B) TO GENERATE A NRC FOR LOOSE; PULLED OR MISSING FASTENERS; THE MAINT SVC CHK PER MT 312-00-01 HAS YOU CHKING THE SAME PANELS (11; ITEM B) BUT DOES NOT HAVE THE REQUIREMENT FOR THE NRC. I FIND THE REQUIREMENT TO DO THESE TASKS ON SEPARATE CHKS WITH DIFFERENT PAPERWORK REQUIREMENTS CONFUSING.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.