ACN | 715862 |
Time | |
Date | 200610 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Flight Conditions | VMC |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 715862 |
Person 2 | |
Affiliation | company : air carrier |
Function | oversight : supervisor |
Events | |
Anomaly | maintenance problem : improper documentation non adherence : far non adherence : published procedure |
Independent Detector | other other : 3 |
Resolutory Action | none taken : detected after the fact |
Consequence | other other |
Factors | |
Maintenance | contributing factor : work cards performance deficiency : non compliance with legal requirements performance deficiency : repair performance deficiency : scheduled maintenance |
Supplementary | |
Problem Areas | Company Maintenance Human Performance Chart Or Publication |
Primary Problem | Maintenance Human Performance |
Situations | |
Publication | Engine Buildup Manual |
Narrative:
I received a change request from the blade and vane shop supervisor to create four CF6-80A compressor blades. Attached to this request was a marked-up copy of a shop order with the requested changes. I made the changes per the attached copy for one data record and then locked-out the data record. I gave a copy of the locked data record to the supervisor to check and make sure every repair. All ge CF6-80c2b6 blades were locked on oct/tue/06. Task line was correct. I received the copy back and was told it was ok. I proceeded to make the changes on the other.
Original NASA ASRS Text
Title: A CF6-80 COMPRESSOR BLADE JOB CARD PROCS WERE CHANGED WITHOUT ENGINEERING APPROVAL.
Narrative: I RECEIVED A CHANGE REQUEST FROM THE BLADE AND VANE SHOP SUPVR TO CREATE FOUR CF6-80A COMPRESSOR BLADES. ATTACHED TO THIS REQUEST WAS A MARKED-UP COPY OF A SHOP ORDER WITH THE REQUESTED CHANGES. I MADE THE CHANGES PER THE ATTACHED COPY FOR ONE DATA RECORD AND THEN LOCKED-OUT THE DATA RECORD. I GAVE A COPY OF THE LOCKED DATA RECORD TO THE SUPVR TO CHK AND MAKE SURE EVERY REPAIR. ALL GE CF6-80C2B6 BLADES WERE LOCKED ON OCT/TUE/06. TASK LINE WAS CORRECT. I RECEIVED THE COPY BACK AND WAS TOLD IT WAS OK. I PROCEEDED TO MAKE THE CHANGES ON THE OTHER.