Narrative:

The incorrect fastener hole was inspected due to the error the amt made while accomplishing the first step of the process (engineering order X); which is to remove and discard the specified fasteners. This step does not require a buy-back to ensure the correct fasteners are removed and discarded. The accomplishment of the subsequent steps relies on the first step being accomplished correctly. Additionally; the subsequent 'ndt;' 'I;' and 'rii' steps do not refer the inspector to figure which shows the structural rework.

Google
 

Original NASA ASRS Text

Title: DURING B727-200 ENG PYLONS #1 AND #3 UPPER SKIN AND STRUCTURE INSPECTION AND FASTENER REPLACEMENT PER AN ENGINEERING CHANGE ORDER HAD SOME INCORRECT FASTENERS INSTALLED AT WRONG LOCATIONS. ACFT WERE RELEASED FOR SVC.

Narrative: THE INCORRECT FASTENER HOLE WAS INSPECTED DUE TO THE ERROR THE AMT MADE WHILE ACCOMPLISHING THE FIRST STEP OF THE PROCESS (ENGINEERING ORDER X); WHICH IS TO REMOVE AND DISCARD THE SPECIFIED FASTENERS. THIS STEP DOES NOT REQUIRE A BUY-BACK TO ENSURE THE CORRECT FASTENERS ARE REMOVED AND DISCARDED. THE ACCOMPLISHMENT OF THE SUBSEQUENT STEPS RELIES ON THE FIRST STEP BEING ACCOMPLISHED CORRECTLY. ADDITIONALLY; THE SUBSEQUENT 'NDT;' 'I;' AND 'RII' STEPS DO NOT REFER THE INSPECTOR TO FIGURE WHICH SHOWS THE STRUCTURAL REWORK.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.