37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 727944 |
Time | |
Date | 200702 |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : teb.airport |
State Reference | NJ |
Altitude | msl bound lower : 1500 msl bound upper : 1700 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | tracon : n90.tracon |
Operator | common carrier : charter |
Make Model Name | Light Transport Low Wing 2 Turbojet Eng |
Operating Under FAR Part | Part 135 |
Flight Phase | climbout : initial |
Route In Use | departure sid : teb |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : charter |
Function | flight crew : first officer |
Experience | flight time last 90 days : 165 flight time total : 1300 flight time type : 850 |
ASRS Report | 727944 |
Person 2 | |
Affiliation | company : charter |
Function | flight crew : captain oversight : pic |
Events | |
Anomaly | altitude deviation : overshoot non adherence : published procedure |
Independent Detector | other flight crewa |
Resolutory Action | flight crew : returned to assigned altitude |
Supplementary | |
Problem Areas | Flight Crew Human Performance Airspace Structure |
Primary Problem | Flight Crew Human Performance |
Narrative:
The captain and I took off runway 24 at teb via teb 5 departure. As per operation specifications we the crew briefed the departure for full understanding. After takeoff we climbed to 1500 ft MSL on runway heading at which time the departure calls for a turn to 280 degrees; I looked down to locate heading bug knob to turn to new heading at which time I heard the captain (acting as sic) state 'watch your altitude' while he pushed forward on yoke. Looking at altitude we were through 1700 ft MSL. After apexing we descended and leveled back at 1500 ft MSL.
Original NASA ASRS Text
Title: TURBOJET CREW EXCEEDS ALT RESTR ON TEB 5 DEP.
Narrative: THE CAPT AND I TOOK OFF RWY 24 AT TEB VIA TEB 5 DEP. AS PER OP SPECS WE THE CREW BRIEFED THE DEP FOR FULL UNDERSTANDING. AFTER TAKEOFF WE CLBED TO 1500 FT MSL ON RWY HEADING AT WHICH TIME THE DEP CALLS FOR A TURN TO 280 DEGS; I LOOKED DOWN TO LOCATE HEADING BUG KNOB TO TURN TO NEW HEADING AT WHICH TIME I HEARD THE CAPT (ACTING AS SIC) STATE 'WATCH YOUR ALT' WHILE HE PUSHED FORWARD ON YOKE. LOOKING AT ALT WE WERE THROUGH 1700 FT MSL. AFTER APEXING WE DSNDED AND LEVELED BACK AT 1500 FT MSL.
Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.