Narrative:

Scheduled workload to reinstall right main gear trunnion door since aircraft was flying on cdl with door removed. No log entry was done on aircraft to switch vmo/mmo switch to alternate position. But switching was done after 7 days of flying without door and with an indication problem. Still there is no log entry on complying with the dispatch deviation procedures. Notified my supervisor. Should have better and clear documentation with detailed information on what is being done to aircraft. All deviations should be entered on a log page or generate an information placard about the confign of aircraft.

Google
 

Original NASA ASRS Text

Title: MECHANIC REPORTS ON HIS CARRIER FLYING A B-767 WITH THE RIGHT MAIN GEAR TRUNNION DOOR REMOVED; BUT NO LOG ENTRY WAS DONE TO SWITCH VMO/MMO TO ALTERNATE POSITION FOR SEVEN DAYS.

Narrative: SCHEDULED WORKLOAD TO REINSTALL R MAIN GEAR TRUNNION DOOR SINCE ACFT WAS FLYING ON CDL WITH DOOR REMOVED. NO LOG ENTRY WAS DONE ON ACFT TO SWITCH VMO/MMO SWITCH TO ALTERNATE POS. BUT SWITCHING WAS DONE AFTER 7 DAYS OF FLYING WITHOUT DOOR AND WITH AN INDICATION PROB. STILL THERE IS NO LOG ENTRY ON COMPLYING WITH THE DISPATCH DEV PROCS. NOTIFIED MY SUPVR. SHOULD HAVE BETTER AND CLR DOCUMENTATION WITH DETAILED INFO ON WHAT IS BEING DONE TO ACFT. ALL DEVS SHOULD BE ENTERED ON A LOG PAGE OR GENERATE AN INFO PLACARD ABOUT THE CONFIGN OF ACFT.

Data retrieved from NASA's ASRS site as of May 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.