37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 804107 |
Time | |
Date | 200809 |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B767-300 and 300 ER |
Operating Under FAR Part | Part 121 |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 804107 |
Person 2 | |
Function | maintenance : technician |
ASRS Report | 804106 |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance maintenance problem : improper documentation non adherence : published procedure non adherence : far |
Independent Detector | other other : 3 |
Resolutory Action | none taken : detected after the fact |
Consequence | other |
Factors | |
Maintenance | contributing factor : briefing performance deficiency : repair performance deficiency : scheduled maintenance performance deficiency : non compliance with legal requirements performance deficiency : installation performance deficiency : inspection |
Supplementary | |
Problem Areas | Chart Or Publication Maintenance Human Performance Aircraft |
Primary Problem | Maintenance Human Performance |
Narrative:
Was notified by letter of possible discrepancies of engineering order X step 2.B(27)(B) and step 2.B(20) on B767-300 aircraft. As far as I know; the work was done per the pending airworthiness directive. I believe that after the job was completed and that while the floor boards were still up; there was work being done on the external power contractor that may have had an effect on steps accomplished.
Original NASA ASRS Text
Title: TWO MECHANICS REPORT ON BEING NOTIFIED ABOUT POSSIBLE DISCREPANCIES INVOLVING AN ENGINEERING ORDER TO SEAL AND PROPERLY LABEL A TRANSFORMER RECTIFIER UNIT GROUND BRACKET REWORK ON THEIR B767-300'S.
Narrative: WAS NOTIFIED BY LETTER OF POSSIBLE DISCREPANCIES OF ENGINEERING ORDER X STEP 2.B(27)(B) AND STEP 2.B(20) ON B767-300 ACFT. AS FAR AS I KNOW; THE WORK WAS DONE PER THE PENDING AIRWORTHINESS DIRECTIVE. I BELIEVE THAT AFTER THE JOB WAS COMPLETED AND THAT WHILE THE FLOOR BOARDS WERE STILL UP; THERE WAS WORK BEING DONE ON THE EXTERNAL PWR CONTRACTOR THAT MAY HAVE HAD AN EFFECT ON STEPS ACCOMPLISHED.
Data retrieved from NASA's ASRS site as of May 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.