37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 963074 |
Time | |
Date | 201107 |
Local Time Of Day | 0001-0600 |
Place | |
Locale Reference | ZZZ.Airport |
State Reference | US |
Environment | |
Light | Night |
Aircraft 1 | |
Make Model Name | B737-900 |
Operating Under FAR Part | Part 121 |
Flight Phase | Parked |
Component | |
Aircraft Component | Pylon Fasteners & Latches |
Person 1 | |
Function | Technician |
Qualification | Maintenance Airframe Maintenance Powerplant |
Experience | Maintenance Technician 5 |
Events | |
Anomaly | Aircraft Equipment Problem Critical Deviation - Procedural FAR Deviation - Procedural Published Material / Policy |
Narrative:
Working B737-900 aircraft during #2 service check; [pylon] panels and engine cowlings were removed for [access to] the left and right harness sense connectors and wire inspection. Once inspection was completed; panels and cowlings were ok'd to re-install. I started on right side [of engine] and installed panels and cowlings; than moved to the left side and closed opened panels and cowlings on that side. On the following day; I was notified that aircraft had a gate return due to the panel having loose fasteners. Participated in a fact finding and reviewed computer-based maintenance training (cbt) and videos.
Original NASA ASRS Text
Title: A Line Mechanic was informed he failed to secure an upper pylon panel on a B737-900 aircraft after completion of a Engine/Pylon Harness Inspection. A passenger had noticed an upper pylon panel had 'bounced' during their pushback from the gate and informed the Flight Attendant. Aircraft returned to gate and panel secured.
Narrative: Working B737-900 aircraft during #2 Service Check; [pylon] panels and engine cowlings were removed for [access to] the left and right harness sense connectors and wire inspection. Once inspection was completed; panels and cowlings were OK'd to re-install. I started on right side [of engine] and installed panels and cowlings; than moved to the left side and closed opened panels and cowlings on that side. On the following day; I was notified that aircraft had a gate return due to the panel having loose fasteners. Participated in a fact finding and reviewed Computer-based Maintenance Training (CBT) and videos.
Data retrieved from NASA's ASRS site as of April 2012 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.