Narrative:

According to the oapm (optimization of airspace and procedures in the metroplex) the boach janny route is interrupted by the hec t-fix or the lynxx fix. We need a pdar (preferred departure arrival route).

Google
 

Original NASA ASRS Text

Title: ZLA Center Controller working sectors with new arrival/departure procedures discovered an error in one of the routes.

Narrative: According to the OAPM (Optimization of Airspace and Procedures in the Metroplex) the BOACH JANNY route is interrupted by the HEC t-fix or the LYNXX fix. We need a PDAR (Preferred Departure Arrival Route).

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.