37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 188420 |
Time | |
Date | 199109 |
Day | Wed |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : mod |
State Reference | CA |
Altitude | msl bound lower : 6000 msl bound upper : 6500 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | Light Transport, Low Wing, 2 Turboprop Eng |
Navigation In Use | Other Other |
Flight Phase | climbout : intermediate altitude |
Route In Use | enroute : on vectors enroute airway : sck |
Flight Plan | IFR |
Aircraft 2 | |
Make Model Name | Small Aircraft, High Wing, 1 Eng, Fixed Gear |
Flight Phase | cruise other |
Route In Use | approach : visual enroute : direct |
Flight Plan | VFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : atp |
Experience | flight time last 90 days : 150 flight time total : 4600 flight time type : 1200 |
ASRS Report | 188420 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp pilot : cfi |
Experience | flight time last 90 days : 200 flight time total : 8500 flight time type : 2500 |
ASRS Report | 188417 |
Events | |
Anomaly | conflict : nmac non adherence : far |
Independent Detector | other controllera other flight crewa |
Resolutory Action | flight crew : took evasive action |
Consequence | other |
Miss Distance | horizontal : 0 vertical : 100 |
Supplementary | |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | Pilot Deviation |
Narrative:
Climbing out from modesto airport on scheduled flight, we were on vectors to intercept the mod 245 degree radial. Around 6000 ft to 6500 ft MSL, the stockton controller said that we had traffic at our 10-11 O'clock, I did not hear the rest, because at this time I was making a rapid movement to miss an small aircraft that was at our altitude and within 100 ft from us. If the controller had not given us this call, I believe there would have been a midair. My only concern was why the call did not come sooner. Supplemental information from acn 188417: on climb out from modesto had just completed memory items or flow on after takeoff checklist and was reading checklist to ensure it was complete. I looked and saw we were on what looked to be a collision course with an small aircraft converging from the left. I immediately grabbed the control yoke and pulled into a steeper climb to overfly the small aircraft. The flight attendant fell to the floor from the sudden increase in G force. Contributing to our not seeing the small aircraft sooner was being on a new route and following a new checklist procedure which now calls for shutting down the auxiliary power unit out of 5000 ft. Except for a scare, the system did work. The controller did his job and we did ours.
Original NASA ASRS Text
Title: NMAC.
Narrative: CLBING OUT FROM MODESTO ARPT ON SCHEDULED FLT, WE WERE ON VECTORS TO INTERCEPT THE MOD 245 DEG RADIAL. AROUND 6000 FT TO 6500 FT MSL, THE STOCKTON CTLR SAID THAT WE HAD TFC AT OUR 10-11 O'CLOCK, I DID NOT HEAR THE REST, BECAUSE AT THIS TIME I WAS MAKING A RAPID MOVEMENT TO MISS AN SMA THAT WAS AT OUR ALT AND WITHIN 100 FT FROM US. IF THE CTLR HAD NOT GIVEN US THIS CALL, I BELIEVE THERE WOULD HAVE BEEN A MIDAIR. MY ONLY CONCERN WAS WHY THE CALL DID NOT COME SOONER. SUPPLEMENTAL INFO FROM ACN 188417: ON CLB OUT FROM MODESTO HAD JUST COMPLETED MEMORY ITEMS OR FLOW ON AFTER TKOF CHKLIST AND WAS READING CHKLIST TO ENSURE IT WAS COMPLETE. I LOOKED AND SAW WE WERE ON WHAT LOOKED TO BE A COLLISION COURSE WITH AN SMA CONVERGING FROM THE L. I IMMEDIATELY GRABBED THE CTL YOKE AND PULLED INTO A STEEPER CLB TO OVERFLY THE SMA. THE FLT ATTENDANT FELL TO THE FLOOR FROM THE SUDDEN INCREASE IN G FORCE. CONTRIBUTING TO OUR NOT SEEING THE SMA SOONER WAS BEING ON A NEW RTE AND FOLLOWING A NEW CHKLIST PROC WHICH NOW CALLS FOR SHUTTING DOWN THE AUX PWR UNIT OUT OF 5000 FT. EXCEPT FOR A SCARE, THE SYS DID WORK. THE CTLR DID HIS JOB AND WE DID OURS.