37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 272189 |
Time | |
Date | 199405 |
Day | Mon |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : mci |
State Reference | MO |
Altitude | agl bound lower : 0 agl bound upper : 0 |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B727 Undifferentiated or Other Model |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : holding other |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : atp |
Experience | flight time last 90 days : 200 flight time total : 11000 flight time type : 2000 |
ASRS Report | 272189 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : second officer |
Qualification | pilot : cfi pilot : commercial pilot : flight engineer pilot : atp pilot : instrument |
Experience | flight time last 90 days : 180 flight time total : 6000 flight time type : 1250 |
ASRS Report | 272326 |
Events | |
Anomaly | aircraft equipment problem : critical other anomaly other |
Independent Detector | other flight crewa |
Resolutory Action | other |
Consequence | Other |
Supplementary | |
Primary Problem | Aircraft |
Air Traffic Incident | other |
Narrative:
Inbound flight arrived with numerous logbook write-ups and deferred items. The #3 engine was slow to accelerate on one of those write-ups. Maintenance was performed and the aircraft signed off as airworthy with the provision that the air crew accomplish an engine run-up to see if it met required parameters. This was to be accomplished as part of the predep checks. While lined up on the runway 19R mci, the engines were run up. The #3 engine failed the run-up test and the aircraft returned to the gate. The passenger were removed and the flight was canceled.
Original NASA ASRS Text
Title: ACFT FUEL EQUIP PROB.
Narrative: INBOUND FLT ARRIVED WITH NUMEROUS LOGBOOK WRITE-UPS AND DEFERRED ITEMS. THE #3 ENG WAS SLOW TO ACCELERATE ON ONE OF THOSE WRITE-UPS. MAINT WAS PERFORMED AND THE ACFT SIGNED OFF AS AIRWORTHY WITH THE PROVISION THAT THE AIR CREW ACCOMPLISH AN ENG RUN-UP TO SEE IF IT MET REQUIRED PARAMETERS. THIS WAS TO BE ACCOMPLISHED AS PART OF THE PREDEP CHKS. WHILE LINED UP ON THE RWY 19R MCI, THE ENGS WERE RUN UP. THE #3 ENG FAILED THE RUN-UP TEST AND THE ACFT RETURNED TO THE GATE. THE PAX WERE REMOVED AND THE FLT WAS CANCELED.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.