37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 294289 |
Time | |
Date | 199501 |
Day | Fri |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | atc facility : mrb airport : iad |
State Reference | WV |
Altitude | msl bound lower : 9300 msl bound upper : 10000 |
Environment | |
Flight Conditions | IMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | artcc : zdc |
Operator | common carrier : air carrier |
Make Model Name | Jetstream 41 |
Operating Under FAR Part | Part 135 |
Flight Phase | descent other |
Route In Use | enroute airway : v143 |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : atp |
Experience | flight time last 90 days : 100 flight time total : 4800 flight time type : 130 |
ASRS Report | 294289 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : cfi pilot : atp |
ASRS Report | 294193 |
Events | |
Anomaly | altitude deviation : overshoot non adherence : clearance other anomaly other |
Independent Detector | atc equipment other atc equipment : unspecified other controllera |
Resolutory Action | flight crew : returned to intended course or assigned course other |
Consequence | Other |
Supplementary | |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | Pilot Deviation |
Narrative:
We were cleared to 9000 ft. I was PF. PNF was on communication #2 getting gate information from company. During this time we were given holding instructions at robert intersection, and told to be through 10000 ft in 2 mins. I read back the clearance. At 9300 ft the controller asked us our altitude and told us to climb back to 10000 ft, fly heading 320 degrees to enter the hold. Original clearance was to descend to 9000 ft prior to receiving holding instructions. At the time this occurred the controller was very busy giving holding instructions to inbound dulles traffic and may have misunderstood our readback.
Original NASA ASRS Text
Title: FLC OVERSHOT ALT ON DSCNT DUE TO MISUNDERSTANDING OF THE CLRNC.
Narrative: WE WERE CLRED TO 9000 FT. I WAS PF. PNF WAS ON COM #2 GETTING GATE INFO FROM COMPANY. DURING THIS TIME WE WERE GIVEN HOLDING INSTRUCTIONS AT ROBERT INTXN, AND TOLD TO BE THROUGH 10000 FT IN 2 MINS. I READ BACK THE CLRNC. AT 9300 FT THE CTLR ASKED US OUR ALT AND TOLD US TO CLB BACK TO 10000 FT, FLY HDG 320 DEGS TO ENTER THE HOLD. ORIGINAL CLRNC WAS TO DSND TO 9000 FT PRIOR TO RECEIVING HOLDING INSTRUCTIONS. AT THE TIME THIS OCCURRED THE CTLR WAS VERY BUSY GIVING HOLDING INSTRUCTIONS TO INBOUND DULLES TFC AND MAY HAVE MISUNDERSTOOD OUR READBACK.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.