37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 309970 |
Time | |
Date | 199507 |
Day | Tue |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : ord |
State Reference | IL |
Altitude | msl bound lower : 11000 msl bound upper : 11900 |
Environment | |
Flight Conditions | IMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | artcc : zau |
Operator | common carrier : air carrier |
Make Model Name | Commercial Fixed Wing |
Operating Under FAR Part | Part 121 |
Flight Phase | climbout : intermediate altitude cruise other |
Route In Use | enroute : on vectors |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : cfi pilot : commercial pilot : instrument |
Experience | flight time last 90 days : 250 flight time total : 2500 flight time type : 250 |
ASRS Report | 309970 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
Events | |
Anomaly | altitude deviation : overshoot non adherence : clearance |
Independent Detector | other controllera other flight crewa |
Resolutory Action | flight crew : returned to intended course or assigned course |
Consequence | Other |
Supplementary | |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | Pilot Deviation |
Narrative:
The captain was flying, the autoplt was on. I was calling back times to company. The altitude capture on the autoplt did not work and we flew through the assigned altitude by 800-900 ft. Company has policy of calling out altitudes to go during approachs only, in this type of aircraft. Company should have policy for PNF to call out altitudes to go during all phases of flight. I do now!
Original NASA ASRS Text
Title: FLC FAILS TO LEVEL AT ASSIGNED ALT. ALT OVERSHOT CLB.
Narrative: THE CAPT WAS FLYING, THE AUTOPLT WAS ON. I WAS CALLING BACK TIMES TO COMPANY. THE ALT CAPTURE ON THE AUTOPLT DID NOT WORK AND WE FLEW THROUGH THE ASSIGNED ALT BY 800-900 FT. COMPANY HAS POLICY OF CALLING OUT ALTS TO GO DURING APCHS ONLY, IN THIS TYPE OF ACFT. COMPANY SHOULD HAVE POLICY FOR PNF TO CALL OUT ALTS TO GO DURING ALL PHASES OF FLT. I DO NOW!
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.