Narrative:

On arrival to the lga terminal area, as the PNF, I was off the center frequency copying the ATIS and communicating with company operations. During that time clearance was given and acknowledged by the captain to cross somto at 13000 ft. Our current altitude was FL260. Upon returning to the center frequency, I questioned the new altitude set in the mode control panel (13000 ft), but failed to verify that altitude had been properly set in the FMC. It had been set to cross ard at 13000 ft instead of somto, 10 mi earlier. ATC questioned our altitude at which time we discovered that we had missed our crossing restr. There was no conflict. I would suggest some type of verbal requirement between pilots to ensure that all clrncs will be complied with in sits where one pilot is absent from the center frequency. This should possibly include a statement of 'briefing complete,' when all changes are voiced.

Google
 

Original NASA ASRS Text

Title: ON ARR INTO LGA THE PNF WAS OFF THE CTR FREQ GETTING THE ATIS AND TALKING TO COMPANY. DURING THAT TIME A CLRNC WAS ACKNOWLEDGED BY THE PF TO CROSS SOMTO AT 13000 FT. THE ALT HAD BEEN SET ON THE MCP, BUT, TO CROSS ARD IN THE FMC INSTEAD OF SOMTO WHICH IS 10 MI EARLIER. ATC QUESTIONED THE ALT BUT THE FLC HAD ALREADY MISSED THE RESTR. THE RPTR SUGGESTED SOME PROC NEEDS TO EXIST THAT ASSURES THE NEW CLRNC IS THOROUGHLY BRIEFED.

Narrative: ON ARR TO THE LGA TERMINAL AREA, AS THE PNF, I WAS OFF THE CTR FREQ COPYING THE ATIS AND COMMUNICATING WITH COMPANY OPS. DURING THAT TIME CLRNC WAS GIVEN AND ACKNOWLEDGED BY THE CAPT TO CROSS SOMTO AT 13000 FT. OUR CURRENT ALT WAS FL260. UPON RETURNING TO THE CTR FREQ, I QUESTIONED THE NEW ALT SET IN THE MODE CTL PANEL (13000 FT), BUT FAILED TO VERIFY THAT ALT HAD BEEN PROPERLY SET IN THE FMC. IT HAD BEEN SET TO CROSS ARD AT 13000 FT INSTEAD OF SOMTO, 10 MI EARLIER. ATC QUESTIONED OUR ALT AT WHICH TIME WE DISCOVERED THAT WE HAD MISSED OUR XING RESTR. THERE WAS NO CONFLICT. I WOULD SUGGEST SOME TYPE OF VERBAL REQUIREMENT BTWN PLTS TO ENSURE THAT ALL CLRNCS WILL BE COMPLIED WITH IN SITS WHERE ONE PLT IS ABSENT FROM THE CTR FREQ. THIS SHOULD POSSIBLY INCLUDE A STATEMENT OF 'BRIEFING COMPLETE,' WHEN ALL CHANGES ARE VOICED.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.