Narrative:

Departing from mdw airport on the midway 4 departure you are to complete your initial turn within 4 DME of the airport. We completed our turn at approximately 4.3 DME. The controller asked us to verify our assigned heading. We told him it was 090 degrees and nothing more was said. We had a reduced climb power setting which I elected to use due to very cold conditions. We were required to climb to 1300 ft before beginning our turn. The slower climb delayed our turn slightly. I probably could have used a slightly higher bank angle to expedite the turn. I do not feel safety was compromised in any way.

Google
 

Original NASA ASRS Text

Title: AN LR35 ON MIDWAY 4 DEP OFF MDW OVERSHOT THE 4 DME TURN POINT AND WAS QUESTIONED ABOUT HIS HDG BY THE DEP CTLR.

Narrative: DEPARTING FROM MDW ARPT ON THE MIDWAY 4 DEP YOU ARE TO COMPLETE YOUR INITIAL TURN WITHIN 4 DME OF THE ARPT. WE COMPLETED OUR TURN AT APPROX 4.3 DME. THE CTLR ASKED US TO VERIFY OUR ASSIGNED HDG. WE TOLD HIM IT WAS 090 DEGS AND NOTHING MORE WAS SAID. WE HAD A REDUCED CLB PWR SETTING WHICH I ELECTED TO USE DUE TO VERY COLD CONDITIONS. WE WERE REQUIRED TO CLB TO 1300 FT BEFORE BEGINNING OUR TURN. THE SLOWER CLB DELAYED OUR TURN SLIGHTLY. I PROBABLY COULD HAVE USED A SLIGHTLY HIGHER BANK ANGLE TO EXPEDITE THE TURN. I DO NOT FEEL SAFETY WAS COMPROMISED IN ANY WAY.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.