37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 433190 |
Time | |
Date | 199903 |
Day | Wed |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : sjc.airport |
State Reference | CA |
Environment | |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | MD-80 Super 80 |
Operating Under FAR Part | Part 121 |
Flight Phase | other |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : instrument |
ASRS Report | 433190 |
Person 2 | |
Affiliation | company : air carrier |
Function | other personnel other |
Events | |
Anomaly | non adherence : company policies non adherence : far |
Independent Detector | other other : cgp2 |
Resolutory Action | none taken : detected after the fact |
Supplementary | |
Problem Areas | Flight Crew Human Performance Company |
Primary Problem | Flight Crew Human Performance |
Narrative:
Exceeded 100 hours in calendar month. I was unaware I had exceeded 100 hours in a calendar month, even considering fly-through time because had I not exceeded scheduled flying time, the 100 hours would never have been exceeded. Unfortunately, crew schedule and crew tracking did not catch this in time to remove me from the last trip of the month.
Original NASA ASRS Text
Title: ACR PLT EXCEEDED 100 FLT HRS IN A CALENDAR MONTH.
Narrative: EXCEEDED 100 HRS IN CALENDAR MONTH. I WAS UNAWARE I HAD EXCEEDED 100 HRS IN A CALENDAR MONTH, EVEN CONSIDERING FLY-THROUGH TIME BECAUSE HAD I NOT EXCEEDED SCHEDULED FLYING TIME, THE 100 HRS WOULD NEVER HAVE BEEN EXCEEDED. UNFORTUNATELY, CREW SCHEDULE AND CREW TRACKING DID NOT CATCH THIS IN TIME TO REMOVE ME FROM THE LAST TRIP OF THE MONTH.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.