Narrative:

Air carrier X on a vector climbing through air carrier Y. Initiated turn on air carrier X, was not enough to ensure separation. Air carrier X was turned to a 340 degree heading and air carrier Y was turned also. Separation loss.

Google
 

Original NASA ASRS Text

Title: ZDC CTLR LOST SEPARATION BTWN ACR X CLBING AND ACR Y DSNDING.

Narrative: ACR X ON A VECTOR CLBING THROUGH ACR Y. INITIATED TURN ON ACR X, WAS NOT ENOUGH TO ENSURE SEPARATION. ACR X WAS TURNED TO A 340 DEG HDG AND ACR Y WAS TURNED ALSO. SEPARATION LOSS.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.