37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 450930 |
Time | |
Date | 199910 |
Day | Sun |
Local Time Of Day | 1801 To 2400 |
Place | |
Locale Reference | airport : msy.airport |
State Reference | LA |
Altitude | msl single value : 16000 |
Environment | |
Flight Conditions | VMC |
Light | Night |
Aircraft 1 | |
Controlling Facilities | artcc : zhu.artcc |
Operator | common carrier : air carrier |
Make Model Name | Light Transport, Low Wing, 2 Turboprop Eng |
Operating Under FAR Part | Part 121 |
Flight Phase | cruise : level |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : cfi pilot : instrument pilot : multi engine pilot : atp |
Experience | flight time last 90 days : 150 flight time total : 4300 flight time type : 2200 |
ASRS Report | 450930 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
Events | |
Anomaly | non adherence : published procedure non adherence : far non adherence : company policies |
Independent Detector | other flight crewa |
Resolutory Action | none taken : detected after the fact |
Supplementary | |
Problem Areas | FAA Flight Crew Human Performance Company |
Primary Problem | Company |
Narrative:
I work for an airline which has us do a monthly hour tracking form. Unfortunately, the month ended in the middle of a 7 day flight period. I started a new form but made a mistake counting back days between the present and previous month's form. I, therefore, left one day off and wound up flying 45 mins over the maximum allowed for a 7 day period. I did not discover this until I completed the form for that period. The company schedulers gave me no indication I was approaching my limit.
Original NASA ASRS Text
Title: LTT FO EXCEEDED THE MAX FLT TIME FOR A 7 DAY PERIOD.
Narrative: I WORK FOR AN AIRLINE WHICH HAS US DO A MONTHLY HR TRACKING FORM. UNFORTUNATELY, THE MONTH ENDED IN THE MIDDLE OF A 7 DAY FLT PERIOD. I STARTED A NEW FORM BUT MADE A MISTAKE COUNTING BACK DAYS BTWN THE PRESENT AND PREVIOUS MONTH'S FORM. I, THEREFORE, LEFT ONE DAY OFF AND WOUND UP FLYING 45 MINS OVER THE MAX ALLOWED FOR A 7 DAY PERIOD. I DID NOT DISCOVER THIS UNTIL I COMPLETED THE FORM FOR THAT PERIOD. THE COMPANY SCHEDULERS GAVE ME NO INDICATION I WAS APCHING MY LIMIT.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.