Narrative:

During an aircraft audit performed by our inspections/records department, it was discovered that when this aircraft was converted to a contract zone inspection (aug/xa/96) the zone 7 was not completed. Log page wxxx states zone 7 inspection due at 7919.0. However, inspections/records department computer run indicated zone 7 due at 10463.7. This discrepancy resulted in the overflying of zone 7 inspection by 1589.7 hours.

Google
 

Original NASA ASRS Text

Title: A BELL 412 WHEN REQUIRED INSPECTION TIMES WERE CHANGED FROM MANUFACTURER'S SCHEDULE TO A CONTRACT SCHEDULE IT RESULTED IN A REQUIRED ZONE CHK DISCOVERED 1589 HRS OVERDUE.

Narrative: DURING AN ACFT AUDIT PERFORMED BY OUR INSPECTIONS/RECORDS DEPT, IT WAS DISCOVERED THAT WHEN THIS ACFT WAS CONVERTED TO A CONTRACT ZONE INSPECTION (AUG/XA/96) THE ZONE 7 WAS NOT COMPLETED. LOG PAGE WXXX STATES ZONE 7 INSPECTION DUE AT 7919.0. HOWEVER, INSPECTIONS/RECORDS DEPT COMPUTER RUN INDICATED ZONE 7 DUE AT 10463.7. THIS DISCREPANCY RESULTED IN THE OVERFLYING OF ZONE 7 INSPECTION BY 1589.7 HRS.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.