37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 461747 |
Time | |
Date | 200001 |
Day | Fri |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air taxi |
Make Model Name | Bell Helicopter 412 |
Operating Under FAR Part | Part 135 |
Flight Phase | ground : maintenance ground : parked |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Qualification | technician : powerplant technician : airframe |
ASRS Report | 461747 |
Person 2 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Qualification | technician : airframe technician : powerplant |
ASRS Report | 461613 |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper documentation maintenance problem : improper maintenance non adherence : far non adherence : published procedure |
Independent Detector | other other : 3 |
Resolutory Action | none taken : detected after the fact |
Consequence | other |
Factors | |
Maintenance | contributing factor : engineering procedure performance deficiency : logbook entry performance deficiency : non compliance with legal requirements performance deficiency : inspection |
Supplementary | |
Problem Areas | Flight Crew Human Performance Aircraft Chart Or Publication Maintenance Human Performance |
Primary Problem | Maintenance Human Performance |
Situations | |
Publication | Maintenance Manual Inspection Time |
Narrative:
During an aircraft audit performed by our inspections/records department, it was discovered that when this aircraft was converted to a contract zone inspection (aug/xa/96) the zone 7 was not completed. Log page wxxx states zone 7 inspection due at 7919.0. However, inspections/records department computer run indicated zone 7 due at 10463.7. This discrepancy resulted in the overflying of zone 7 inspection by 1589.7 hours.
Original NASA ASRS Text
Title: A BELL 412 WHEN REQUIRED INSPECTION TIMES WERE CHANGED FROM MANUFACTURER'S SCHEDULE TO A CONTRACT SCHEDULE IT RESULTED IN A REQUIRED ZONE CHK DISCOVERED 1589 HRS OVERDUE.
Narrative: DURING AN ACFT AUDIT PERFORMED BY OUR INSPECTIONS/RECORDS DEPT, IT WAS DISCOVERED THAT WHEN THIS ACFT WAS CONVERTED TO A CONTRACT ZONE INSPECTION (AUG/XA/96) THE ZONE 7 WAS NOT COMPLETED. LOG PAGE WXXX STATES ZONE 7 INSPECTION DUE AT 7919.0. HOWEVER, INSPECTIONS/RECORDS DEPT COMPUTER RUN INDICATED ZONE 7 DUE AT 10463.7. THIS DISCREPANCY RESULTED IN THE OVERFLYING OF ZONE 7 INSPECTION BY 1589.7 HRS.