Narrative:

After repeated spacing vectors, airspeed assignments and altitude changes, we were given a vector to intercept runway 25L localizer. Our company procedures specify an LNAV intercept at that distance from field. As PNF, I proceeded to build an intercept off a fix on the approach. As we were close to the localizer already, we flew through it before I could get the intercept leg in the box. I was heads down with the CDU work and both of us missed the intercept on raw data.

Google
 

Original NASA ASRS Text

Title: B757 CREW OVERSHOOTS TURN TO FINAL ON ARR TO LAS.

Narrative: AFTER REPEATED SPACING VECTORS, AIRSPD ASSIGNMENTS AND ALT CHANGES, WE WERE GIVEN A VECTOR TO INTERCEPT RWY 25L LOC. OUR COMPANY PROCS SPECIFY AN LNAV INTERCEPT AT THAT DISTANCE FROM FIELD. AS PNF, I PROCEEDED TO BUILD AN INTERCEPT OFF A FIX ON THE APCH. AS WE WERE CLOSE TO THE LOC ALREADY, WE FLEW THROUGH IT BEFORE I COULD GET THE INTERCEPT LEG IN THE BOX. I WAS HEADS DOWN WITH THE CDU WORK AND BOTH OF US MISSED THE INTERCEPT ON RAW DATA.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.