Narrative:

On nov/sun/00, the ZSE ARSR was OTS. With this equipment inoperative, we had seattle approach control radar integrated in the counter. In doing so, we turned a sector that we can run 3 mi single sight, to one that required 5 mi mosaic radar. When your sector and chalk marks are set up for 3 mi separation, they are difficult to run 5 mi.

Google
 

Original NASA ASRS Text

Title: ZSE CTLR INVOLVED IN OPERROR DURING SIT WHEN S46 TRACON RADAR INTEGRATED INTO ZSE RADAR CTL POS.

Narrative: ON NOV/SUN/00, THE ZSE ARSR WAS OTS. WITH THIS EQUIP INOP, WE HAD SEATTLE APCH CTL RADAR INTEGRATED IN THE COUNTER. IN DOING SO, WE TURNED A SECTOR THAT WE CAN RUN 3 MI SINGLE SIGHT, TO ONE THAT REQUIRED 5 MI MOSAIC RADAR. WHEN YOUR SECTOR AND CHALK MARKS ARE SET UP FOR 3 MI SEPARATION, THEY ARE DIFFICULT TO RUN 5 MI.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.