ACN | 497394 |
Time | |
Date | 200101 |
Day | Tue |
Local Time Of Day | 1801 To 2400 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Night |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B737-300 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : parked ground : maintenance |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : lead technician |
Qualification | technician : airframe technician : fcc technician : powerplant |
Experience | maintenance lead technician : 2 maintenance technician : 20 |
ASRS Report | 497394 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : atp |
Events | |
Anomaly | aircraft equipment problem : less severe maintenance problem : improper maintenance non adherence : published procedure non adherence : far |
Independent Detector | other flight crewa |
Resolutory Action | none taken : detected after the fact |
Consequence | other |
Factors | |
Maintenance | contributing factor : schedule pressure performance deficiency : logbook entry performance deficiency : repair |
Supplementary | |
Problem Areas | Flight Crew Human Performance Maintenance Human Performance Aircraft |
Primary Problem | Maintenance Human Performance |
Narrative:
A few mins before departure time of air carrier flight, captain reported 1 screw missing on right wing junction fairing over #2 engine, at l-hand side of forward part of fairing. Since I only had a few mins to meet scheduled departure time, I proceeded to create a write-up and deferral. I checked the MEL and list, but I found no reference to defer it under. I proceeded to speed tape the screw hole and defer the item under air carrier maintenance procedure. Approximately 1 hour later, maintenance called me to notify me that such an item was not deferrable per the structural repair manual of air carrier B737-300. Upon arrival of aircraft to wxz, screw repair and installation was made and item deferral abc was cleared.
Original NASA ASRS Text
Title: A B737-300 WAS DISPATCHED IN NON COMPLIANCE WITH AN UNAPPROVED AND UNAUTH INTERIM REPAIR TO THE R WING PYLON FAIRING.
Narrative: A FEW MINS BEFORE DEP TIME OF ACR FLT, CAPT RPTED 1 SCREW MISSING ON R WING JUNCTION FAIRING OVER #2 ENG, AT L-HAND SIDE OF FORWARD PART OF FAIRING. SINCE I ONLY HAD A FEW MINS TO MEET SCHEDULED DEP TIME, I PROCEEDED TO CREATE A WRITE-UP AND DEFERRAL. I CHKED THE MEL AND LIST, BUT I FOUND NO REF TO DEFER IT UNDER. I PROCEEDED TO SPD TAPE THE SCREW HOLE AND DEFER THE ITEM UNDER ACR MAINT PROC. APPROX 1 HR LATER, MAINT CALLED ME TO NOTIFY ME THAT SUCH AN ITEM WAS NOT DEFERRABLE PER THE STRUCTURAL REPAIR MANUAL OF ACR B737-300. UPON ARR OF ACFT TO WXZ, SCREW REPAIR AND INSTALLATION WAS MADE AND ITEM DEFERRAL ABC WAS CLRED.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.