37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 510507 |
Time | |
Date | 200105 |
Day | Tue |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : hky.airport |
State Reference | NC |
Environment | |
Flight Conditions | VMC |
Light | Daylight |
Aircraft 1 | |
Controlling Facilities | artcc : ztl.artcc tower : day.tower |
Operator | general aviation : corporate |
Make Model Name | Learjet 35 |
Operating Under FAR Part | Part 91 |
Flight Phase | cruise : level |
Flight Plan | IFR |
Person 1 | |
Affiliation | government : faa |
Function | controller : radar |
Qualification | controller : radar |
Experience | controller radar : 19 |
ASRS Report | 510507 |
Person 2 | |
Affiliation | government : faa |
Function | controller : local |
Events | |
Anomaly | non adherence : published procedure non adherence other |
Independent Detector | other controllera |
Resolutory Action | controller : issued new clearance none taken : detected after the fact |
Supplementary | |
Problem Areas | ATC Human Performance Flight Crew Human Performance |
Primary Problem | ATC Human Performance |
Air Traffic Incident | Inter Facility Coordination Failure |
Situations | |
ATC Facility | procedure or policy : ztl.artcc |
Narrative:
There are expanded east coast plan rtes to iad. The PF had to be passed manually to hky tower, a contract tower without an fdep/fiod. Assuming the strip was printed at XD30Z, it sat on the sector for over 2 hours without anyone amending it to the correct routing. Despite the fact that I brought it to the attention of a controller working the sector. Eecp rtes are incorporated into the LOA with ZDC. They are required. 1) why does the FAA accept flight plans without the required stars? 2) why isn't the required route issued as a pdar? 3) why can't a pilot flying a $20 million airplane file a STAR? 4) why can't a controller find the time to amend the route in 2+ hours. 5) why does duats put latitude/longitudes in the flight plan? 6) how long is this going to go on?
Original NASA ASRS Text
Title: ZTL CTLR CONCERNED WITH LACK OF PREVIOUS CTLR STRIP AMENDMENT FOLLOW-THROUGH.
Narrative: THERE ARE EXPANDED EAST COAST PLAN RTES TO IAD. THE PF HAD TO BE PASSED MANUALLY TO HKY TWR, A CONTRACT TWR WITHOUT AN FDEP/FIOD. ASSUMING THE STRIP WAS PRINTED AT XD30Z, IT SAT ON THE SECTOR FOR OVER 2 HRS WITHOUT ANYONE AMENDING IT TO THE CORRECT ROUTING. DESPITE THE FACT THAT I BROUGHT IT TO THE ATTN OF A CTLR WORKING THE SECTOR. EECP RTES ARE INCORPORATED INTO THE LOA WITH ZDC. THEY ARE REQUIRED. 1) WHY DOES THE FAA ACCEPT FLT PLANS WITHOUT THE REQUIRED STARS? 2) WHY ISN'T THE REQUIRED RTE ISSUED AS A PDAR? 3) WHY CAN'T A PLT FLYING A $20 MILLION AIRPLANE FILE A STAR? 4) WHY CAN'T A CTLR FIND THE TIME TO AMEND THE RTE IN 2+ HRS. 5) WHY DOES DUATS PUT LATITUDE/LONGITUDES IN THE FLT PLAN? 6) HOW LONG IS THIS GOING TO GO ON?
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.