ACN | 529818 |
Time | |
Date | 200111 |
Day | Sun |
Local Time Of Day | 1201 To 1800 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B737-300 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : parked |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | other personnel other |
ASRS Report | 529818 |
Person 2 | |
Affiliation | company : air carrier |
Function | other personnel other |
Events | |
Anomaly | aircraft equipment problem : less severe maintenance problem : improper maintenance maintenance problem : improper documentation non adherence : far non adherence : published procedure |
Independent Detector | other other : 969 |
Consequence | other other |
Factors | |
Maintenance | contributing factor : schedule pressure contributing factor : manuals performance deficiency : non compliance with legal requirements performance deficiency : repair performance deficiency : logbook entry |
Supplementary | |
Problem Areas | Aircraft Maintenance Human Performance |
Primary Problem | Maintenance Human Performance |
Narrative:
One fastener was missing from a fairing on top of the right engine pylon. The fastener was deferred per the srm and the aircraft departed. After discussing the deferral with our engineering department it was determined this srm reference did not cover this panel so the aircraft was stopped at the next station and engineering issued an authority/authorized to operate with the fastener missing for 2 days until the aircraft could stay overnight at a maintenance station.
Original NASA ASRS Text
Title: A B737-300 WAS DISPATCHED IN NON COMPLIANCE WITH A R PYLON FASTENER MISSING AND DEFERRED PER THE SRM. LATER DISCOVERED REF IN ERROR.
Narrative: ONE FASTENER WAS MISSING FROM A FAIRING ON TOP OF THE R ENG PYLON. THE FASTENER WAS DEFERRED PER THE SRM AND THE ACFT DEPARTED. AFTER DISCUSSING THE DEFERRAL WITH OUR ENGINEERING DEPT IT WAS DETERMINED THIS SRM REF DID NOT COVER THIS PANEL SO THE ACFT WAS STOPPED AT THE NEXT STATION AND ENGINEERING ISSUED AN AUTH TO OPERATE WITH THE FASTENER MISSING FOR 2 DAYS UNTIL THE ACFT COULD STAY OVERNIGHT AT A MAINT STATION.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.