Narrative:

Called out prior to departure to reinstall L1 door slide. Installed slide per maintenance manual. Signed off on XXX, put in a work package. Mr Y informed me at my duty start time on 05/thu/02, the slide written up by flight crew became loose. Maintenance found slide needed to be changed. I wish to report this event, door slide was svcable when installed otherwise it would have been changed at sea.

Google
 

Original NASA ASRS Text

Title: A B757-200 PRIOR TO DEP, THE DOOR 1L SLIDE ON A B757-200, WAS REATTACHED TO THE DOOR AS IT WAS RPTED LOOSE BY THE CREW. ON TRIP TERMINATION, SLIDE WAS FOUND LOOSE AND REQUIRED REPLACEMENT.

Narrative: CALLED OUT PRIOR TO DEP TO REINSTALL L1 DOOR SLIDE. INSTALLED SLIDE PER MAINT MANUAL. SIGNED OFF ON XXX, PUT IN A WORK PACKAGE. MR Y INFORMED ME AT MY DUTY START TIME ON 05/THU/02, THE SLIDE WRITTEN UP BY FLC BECAME LOOSE. MAINT FOUND SLIDE NEEDED TO BE CHANGED. I WISH TO RPT THIS EVENT, DOOR SLIDE WAS SVCABLE WHEN INSTALLED OTHERWISE IT WOULD HAVE BEEN CHANGED AT SEA.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.