37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 564131 |
Time | |
Date | 200210 |
Day | Tue |
Local Time Of Day | 0001 To 0600 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B737-300 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : maintenance |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Qualification | technician : airframe technician : powerplant |
ASRS Report | 564131 |
Events | |
Anomaly | aircraft equipment problem : less severe maintenance problem : improper maintenance maintenance problem : improper documentation non adherence : far non adherence : published procedure |
Resolutory Action | none taken : detected after the fact |
Consequence | other other |
Factors | |
Maintenance | contributing factor : schedule pressure performance deficiency : non compliance with legal requirements performance deficiency : logbook entry performance deficiency : scheduled maintenance |
Supplementary | |
Problem Areas | Aircraft Maintenance Human Performance |
Primary Problem | Maintenance Human Performance |
Narrative:
On oct/mon/02, hangar ron shift, I was assigned aircraft service check. All work completed ok during the scheduled shift. I signed the aircraft airworthiness release to complete the work package. The aircraft was scheduled a later mid morning departure. The logbook and work package complete, I clocked off shift at XA00. I was not aware of the aircraft maintenance note mistake until notified oct/tue/02 at XA00 hours. The crew of hangar ron are responsible for multiple aircraft and usually help out in the workload of others -- multiple jobs during the shift.
Original NASA ASRS Text
Title: A B737-300 WAS RELEASED FOR SVC IN NON COMPLIANCE WITH AN OPEN UNANSWERED LOGBOOK RPT.
Narrative: ON OCT/MON/02, HANGAR RON SHIFT, I WAS ASSIGNED ACFT SVC CHK. ALL WORK COMPLETED OK DURING THE SCHEDULED SHIFT. I SIGNED THE ACFT AIRWORTHINESS RELEASE TO COMPLETE THE WORK PACKAGE. THE ACFT WAS SCHEDULED A LATER MID MORNING DEP. THE LOGBOOK AND WORK PACKAGE COMPLETE, I CLOCKED OFF SHIFT AT XA00. I WAS NOT AWARE OF THE ACFT MAINT NOTE MISTAKE UNTIL NOTIFIED OCT/TUE/02 AT XA00 HRS. THE CREW OF HANGAR RON ARE RESPONSIBLE FOR MULTIPLE ACFT AND USUALLY HELP OUT IN THE WORKLOAD OF OTHERS -- MULTIPLE JOBS DURING THE SHIFT.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.