Narrative:

An engineering change order, step 5, requires a purge and drain check of the primary and alternate pitot static system per maintenance manual. We also are tasked with completion of job card 1 and B along with engineering change order. Job card B asks that we check for moisture, purge if moisture is found -- if not, not applicable purge requirement on job card B. We interpreted engineering change order to, in effect, say that if moisture is found, purge as per job card B. Maintenance manual only states that purge is necessary if moisture is found.

Google
 

Original NASA ASRS Text

Title: MD80 ACFT HAVING A PITOT STATIC DRAIN AND PURGE CHK PER AN ENGINEERING CHANGE ORDER ENCOUNTERED CONFLICT WITH JOB CARDS ON ACTION REQUIRED IF MOISTURE IS DISCOVERED IN THE SYS.

Narrative: AN ENGINEERING CHANGE ORDER, STEP 5, REQUIRES A PURGE AND DRAIN CHK OF THE PRIMARY AND ALTERNATE PITOT STATIC SYS PER MAINT MANUAL. WE ALSO ARE TASKED WITH COMPLETION OF JOB CARD 1 AND B ALONG WITH ENGINEERING CHANGE ORDER. JOB CARD B ASKS THAT WE CHK FOR MOISTURE, PURGE IF MOISTURE IS FOUND -- IF NOT, NOT APPLICABLE PURGE REQUIREMENT ON JOB CARD B. WE INTERPED ENGINEERING CHANGE ORDER TO, IN EFFECT, SAY THAT IF MOISTURE IS FOUND, PURGE AS PER JOB CARD B. MAINT MANUAL ONLY STATES THAT PURGE IS NECESSARY IF MOISTURE IS FOUND.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.